|
|
LabIR for GIANO
|
|
GIANO progresses in LabIR (Jul-Dec 2007)
|
|
|
Giano dewar closed again.
|
|
We start the first vacuum operation
|
|
|
|
Giano two phase cooling.
|
|
Short term stability of temperature control
|
|
|
|
Test mount of some optical elements
|
|
Some Giano Team members seen through some optical elements
|
|
|
|
The Giano dewar is just arrived at Arcetri.
|
|
At ground level.
|
|
|
|
Moving the accessories.
|
|
Free from the cage.
|
|
|
|
Inside the laboratory.
|
|
The opening of the Giano Dewar.
|
The full images
sequence
|
|
Some movies:
A
B
C
D
|
|
|
|
Preparation to Giano Dewar trip to Arcetri: Local Map
|
|
Preparation to Giano Dewar trip to Arcetri: inner roads movie.
|
|
|
|
The Giano Dewar under the final test at Cryotech
|
|
The opening of the Giano Dewar.
|
View of some dewar details:
A
B
C
D
E
F
G
H
|
|
|
|
Aligment first steps: TMA1, TMA2 and the measuring camera.
|
|
Details of fiber optic pick-up.
|
|
|
|
The laser light made visible.
|
|
The laser light made visible, details.
|
|
|
|
Starting aligment: TMA1 ready to be tested, front view.
|
|
Starting aligment: TMA1 ready to be tested, side view.
|
|
|
|
Pc104 and Buffer Boards mounted inside the final box, front view.
|
|
Pc104 and Buffer Boards mounted inside the final box, lateral view.
|
|
|
|
Hot boards assembly, top view.
|
|
Hot boards assembly, lateral view.
|
|
|
|
Hot boards assembly, rail details.
|
|
Hot boards assembly, bias regulation access.
|
|