Main Sections
LabIR main page
Instrument page
Documentation
Science Publications

Current activities
Fasti Page
Inside the Lab
LabIR staff

Companion Pages
Tirgo Page
Tirgo Archive
Skysoft Home
Lunar occultations
AO star finder
Simple calculator



LabIR for GIANO

GIANO construction progress in LabIR (Jan-Jun 05)

6 Jun 2005

Images by C.Baffa


     
Output of our newly developed sensor acquisition program gsensd
      Graphical output of gsensd (real dewar data)

18 Apr 2005

Photos by I.Mochi


     
Global trasmittance of OHARA S-NPH2 specimen.
      An example of raw data.

15 Apr 2005

Photos by I.Mochi, E.Giani


     
Surface data of quartz window measured in double pass at 632.8 nm.
      The same data, but transferred into octave and averaged.

13 Apr 2005

Photos by C.Baffa, E.Giani, M.Sozzi


     
The first multiplexer image with DC coupling and optical adaptation.
      The GUI of laboratory program.

30 Mar 05

Photos by C.Baffa, M.Sozzi


     
The cold board and the multiplexer inside their enclosure.
      First meaningful (and noisy) image: a light bulb!

18 Mar 05

Photos by I.Mochi


     
Front and rear view of the mirror-holder prototype.
      The initial experimental set-up for the mirror-holder test.

15 Mar 05

Images by P.Sandri and C.Baffa


     
Specimen of NPH2 glass from OHARA.
      Infrared trasmission of tre specimes.

9 Mar 2005

Photos by C. Baffa, M.Sozzi, E.Giani


     
Output of multiplexer: details of the begin of a row.
      Output of multiplexer: a full row, showing some light at the end.

     
Some clock lines at the end of a row and the begin of the next.
      Rockwell documentation of multiplexer clocking and output.

24 Feb 05

Photos by C. Baffa


     
Our Laboratory during the snow week!
      The immediate surrounding of our laboratory under the snow.

03 Feb 05

Images by C. Baffa / E. Giani


     
The preliminary acquisition system (codenemed Pinocchio)
during hardware and software programming.
      The waveform generated by Pinocchio as captured by the logic
analyzer during tests. The conformance with the project is total.

     
First portion of the output of the waveform program for Giano
detector, frame and first row initialization.
      First few rows of the output of the waveform program
for Giano detector; it is still visible the initialization part.

19 Jan 05

Photos by S. Gennari / G.Falcini


     
Micrometers in aluminium for the prototype of mirrors holders.
      Progress in buildig the prototype of mirrors holders.

10 Jan 05

Photos by C. Baffa


     
Temporary mechanical mount for Hawaii multiplexer.
      Assembly view of temporary mount for Hawaii multiplexer.

W-Files Page ______________ GIANO Home Page